Construction of cable stayed bridge at balanced portion of existing bridge on Tapi River joining Athwalines Adajan in Surat.

Construction of cable stayed bridge at balanced portion of existing bridge on Tapi River joining Athwalines Adajan in Surat. This Single plan four lane bridge is the first of its kind in Gujarat. This is the second bridge constructed at Municipal level after the Verli Bandra Sea Link. The principal specialty of this Cable Stay Bridge is that it has been completed by the local agency at very economical cost and reputed national and international agencies/consultants namely L & T Engineering and OVM –China have been appointed for consultation

  • Client : Surat Municipal Corporation
  • Work Allotted date : 30.07.2015
  • Work Completion date: 02.10.2018

Description of work :

Construction of Cable Strayed Bridge at balance portion of existing bridge on Tapi River joining  Athwalines-Adajan in Surat.