Contact Info

Anuvrat Dwar Flyover

  • Client: Surat Municipal Corporation
  • Category: Construction
  • Date: 15.09.2014
  • Status: Completad

Anuvrat Dwar Fly Over Bridge

C

Construction of 2 x 3 lane fly over bridge on 60.mt wide Udhna-Magdalla road at Anuvrat Dawar junction & canal road junction at Surat BRTS phase—ll.

Undertaking a significant infrastructure endeavor, the project involves the construction of a 2 x 3 lane flyover bridge spanning the 60-meter wide Udhna-Magdalla road at the pivotal junction of Anuvrat Dawar and the Canal Road junction, as part of Surat BRTS Phase II. This transformative initiative aims to alleviate traffic congestion and enhance the efficiency of transportation networks in the bustling city of Surat.

Additionally, the project encompasses the construction of RCC precast and cast-in-site box structures, along with ancillary works, along a 6.25-kilometer stretch of the canal route from Anuvratdawar Junction to ONGC Junction (adjacent to TGB Hotel) via Bharthana Junction. This segment holds paramount importance in bolstering the canal’s infrastructure, ensuring optimal water management and facilitating irrigation needs in the region.

By leveraging advanced engineering techniques and adhering to stringent quality standards, this comprehensive initiative embodies a commitment to sustainable development and improved connectivity, ultimately enriching the lives of residents and businesses in Surat.

 

 

 

 

 

  • Contract under : Ranjit Buildcon ltd
  • Client : Surat Municipal Corporation
  • Work Allotted date : 15.09.2014
  • Work Completion date: 15.07.2016